📡 Offline Mode — Cached data in use
Listening…

Language & Currency Overrides

Manually force currency & speech accents to override browser auto-detection.
Use this if viewing a property in another country (e.g. UK resident browsing Spanish listings).

Primary Build Site Coordinates
Latitude
Longitude
Dream To Home: Build Navigator
Ground-Up Logistics, Costs & Legal Compliance
£ GBP
Site Scouting
Groundworks
2 Structure
3 Watertight
4 First Fix
5 Fit-Out
6 Sign-Off

Land & Property Search

Search development plots, derelict buildings, barn conversions and auction lots. Click any listing to view on the source platform.

📐 Bare Plots🏚️ Derelict🏛️ Barn Conversions🔨 Auction Lots

Search Listings

Live Sources

Acquisition Cost Calculator

Stamp Duty
Total Acquisition
Cost per m²

Full Build Cost Estimator

Stage-by-stage breakdown with adjustable spec, location factor, and waste buffer. Add any stage directly to your Build Ledger.

📊 Stage Breakdown📐 Overage Buffer💷 Live Totals

Project Parameters

Overage / Waste Buffer 10%
Standard 10% buffer — recommended for new ground-up builds with experienced teams.

Stage-by-Stage Breakdown

StageDescriptionMaterialsLabourTotal

Funding, Mortgages & Insurance

Self-build mortgages, development finance, grant schemes, and mandatory insurance products. All providers independently verified.

🏦 Self-Build Mortgage💼 Development Finance🛡️ Site Insurance🎯 Government Grants

Self-Build Mortgages

Verified Providers
ProviderProductMax LTVRateMin Loan
Buildstore
Self-build specialist
Arrears & advance stage85%5.8–7.2%£50k Verified Supplier
Ecology BS
Eco-build focus
Eco self-build & renovation90%5.4–6.8%£25k Verified Supplier
Nationwide BSSelf-build mortgage80%5.9–7.0%£100k Verified Supplier
BuildLoanBridging to self-build75%6.5–8.5%£75k Verified Supplier
Mortgage Affordability Calculator
Loan Required
Est. Monthly
Loan-to-Value

Required Insurance

Mandatory
TypeRequiredTypical CostProvider
Site & Public LiabilityMandatory£800–£2,400/yrSelf Build Zone Verified Supplier
Structural Warranty (10yr)Lender required£1,200–£4,000NHBC / Protek Verified Supplier
Employers LiabilityIf employing£400–£900/yrHiscox Verified Supplier
Professional IndemnityRecommended£300–£700/yrSimply Business Verified Supplier

Grants & Government Schemes

Help to Build Equity Loan — Government tops up deposit 5–20%. Max project value £600k. Apply
Boiler Upgrade Scheme — Up to £7,500 towards heat pumps. Gov.uk
VAT Reclaim — DIY Housebuilders Scheme (431NB) — Reclaim VAT on materials within 3 months of completion. HMRC Guide
Right to Build Register — Local authorities must allocate land. Check Register

Building Materials & Products

All materials listed with verified supplier links. Search by product name or filter by category. Prices are indicative — click Verified Supplier for live pricing.

🧱 Masonry🪵 Timber⛏️ Aggregates🔲 Glazing

Material Search

ProductCategoryPriceUnitSupplier

Fixtures, Fittings & Interiors

Curated selection of fixtures, fittings, décor and furniture for every room. Each product links directly to the correct item on the retailer's website — exactly as shown.

🛁 Bathrooms🍳 Kitchens🛋️ Living🛏️ Bedrooms💡 Lighting🚪 Doors & Hardware

Browse by Category

All product images and descriptions match exactly what you see on the retailer's page. Links open the specific product listed — not a general category or homepage.

Advertise Your Products Here

Open to Suppliers

Are you a supplier of building products, fixtures, fittings, or interior goods? Showcase your products on this platform to reach self-builders and developers actively planning their builds.

Suggest a New Tool or Feature

Help us improve the workstation. Tell us what would make your build journey smoother.

Build Ledger & Financial Tracking

Log every cost, track stage releases, and monitor budget versus actual spend. All data stays in your browser — nothing is sent externally.

💷 Cost Logging📊 Stage Tracking🏦 Milestones📁 PDF / CSV Export

Build Ledger

Total Spent
Budget Remaining
S2
Active Stage
Log New Entry

Mortgage Stage Release Milestones

Build Programme — Gantt Visual Workspace

Visual project programme across all 7 stages. Drag to adjust timelines, mark tasks complete, and export your programme as PDF.

📅 Stage Timeline✅ Task Tracking📄 PDF Export

Project Programme

Complete Active Planned Delayed Today

Legal, Compliance & Building Regulations

NHBC standards, planning legislation, Building Regs, GDPR, and data protection obligations — all with embedded document links.

✅ NHBC📋 Building Regs⚖️ Planning Law🔒 GDPR

NHBC Key Inspection Points

Foundations & Drainage — Building Control must inspect trenches before concrete. NHBC Ch.4.1. NHBC Techzone
DPC at 150mm above finished ground level — Sign-off before brickwork proceeds above DPC.
Structural Connections & Wall Plate — All joist hangers and strap ties inspected before roof load. Ch.6.1.
Roofing Underlay — BS 5534 — Min 100mm lap. Inspector notification required.
First Fix — Part P & L Compliance — Before boarding. Pressure-test drainage.
SAP Assessment & Air Pressure Test — At 50 Pa before second fix. EPC required.
Final Inspection — Building Regs completion cert + NHBC 10-year Buildmark warranty. NHBC

Key Legislation & Documents

DocumentPurposeSource
Building Regulations 2010Parts A–Q minimum standardsGov.uk Approved Docs
Town & Country Planning Act 1990Planning permission requirementsLegislation.gov.uk
Party Wall Act 1996Neighbour notice obligationsGov.uk Guide
UK GDPR / DPA 2018Data handling obligationsICO.org.uk
CDM Regulations 2015Construction Design & ManagementHSE CDM Guide
Health & Safety at Work Act 1974Site safety obligationsHSE.gov.uk

Site Risk Register

RiskLikelihoodImpactMitigation
Ground contaminationMediumHighPhase 1 desk study pre-purchase
Planning refusal / appealMediumHighPre-application LPA engagement
Material price escalationMediumMediumLock wholesale prices; set 15% contingency
Building Control delayLowMediumSubmit Full Plans not Building Notice
Weather / programme slipMediumMediumFloat weeks in programme; watertight before winter

Landscaping & Outside

Curb appeal & terrain. Model your external works investment with ROI up to 175%. Paving (£5k) · Turf (£2k) · Terraces · SUDS Compliance.

🌿 Turfing🧱 Paving🚗 Driveway🌳 Trees💧 SUDS

ROI by Project Type

High ROI Focus · Added Value

Landscaping Budget Planner

Contingency Buffer 10%
Estimated Cost
Value Added
ROI

Document Hub

Upload plans, surveys, invoices, certificates. Generate PDF cost reports and export ledger data. All files processed in your browser — nothing leaves your device.

📄 PDF Reports📁 File Upload⬇️ CSV Export🔒 Browser-Only

Upload Documents

Click or drag files here to upload

PDF, JPG, PNG, DWG, DOC, XLSX — max 20MB each

Generate & Download Reports

Downloadable Templates & Guides

DocumentFormat
Self-Build Programme TemplateXLSX
Site Safety H&S PlanDOCX
Material Take-Off SheetXLSX
VAT Reclaim Form 431NBPDF Gov.uk
CDM Principal Designer ChecklistPDF HSE.gov.uk

Smart Build Innovations

Forward-thinking build methods, sustainable technologies, and modern techniques to reduce costs, cut timelines, and increase property value.

♻️ Sustainable🏭 Off-Site MMC🤖 Smart Home⚡ Energy

Modern Methods of Construction

2025 Trends
⚡ 50% faster build

Structural Insulated Panels (SIPs)

Factory-built wall, floor and roof panels reduce on-site labour by 60%. U-values of 0.11 W/m²K achievable. Typical saving: £8k–£22k versus traditional build. SIPs.org.uk

🏭 Off-site manufacturing

Volumetric Modular Construction

Pre-fabricated room modules reduce on-site programme by 40–60%. Used on 15%+ of new UK homes in 2024. Waste reduction up to 80% vs traditional. BuildOffsite.com

💚 Carbon negative

Cross Laminated Timber (CLT)

Structurally performs like concrete, carbon negative, erectable by 4-person crew in days. 30% lower embodied carbon vs steel frame. CLT Guide

🌡️ Future Building Regs ready

Ground Source Heat Pump + MVHR

CoP 3.5–5.0 — every £1 electricity produces £3.50–£5 heat. BUS grant: up to £7,500. BUS Grant

🤖 +£8k–£25k property value

Smart Wiring at First Fix

CAT6 data, smart lighting bus, EV charging circuit. Only £1.2k–£2.8k extra at first fix stage. Smart Home Guide

📱 Reduces design errors

BIM & Digital Twin Surveying

3D laser scanning from £800–£2k. Creates a digital twin that reduces material waste and identifies underground services before breaking ground.